CALIPSO Data Validation Site NEWS


  • November 19, 2008

    CALIPSO will perform a drag makeup maneuver on or after December 17th. Due to low solar activity, the maneuver may be delayed until January. T he ground track files will include the Leap Second at the end of December. A line with the time stamp '31 Dec 2008 23:59:60' will be in all ground track files that span this time. All entries after this time will properly account for the Leap Second.
  • August 26, 2008

    The CALIPSO payload is in SAFE mode as of 5:37UT on August 26th. The payload should be back in data acquisition mode on August 27th at about 1400UT. A small inclination maneuver will be performed on October 1st, which will has the payload down for about 12 hours. The next DMU maneuver will be in mid-October.

 

 

 

 

 

 

 

 

 


Home | News | Project Documents
Data Exchange Protocol | Instrumented Network Links
HDF File Format | NetCDF File Format | How To Submit Data
How To Receive Data | Getting Involved | Data Catalog | Overpass Times